Arterial Roads

Arterial road salting was completed overnight (1am-3am)

 

Collector Roads

Collector road salting was completed overnight (1am-5am)

 

Local Roads

10:00am – Local road salting, estimated time of completion is 6:00pm

 

Laneways

10:00am – Laneway salting, estimated time of completion is 6:00pm

 

Sidewalks

9:35am – High pedestrian volume sidewalk salting, estimated time of completion is 3:35pm

3:35pm – Low pedestrian volume sidewalk salting to commence immediately following the completion of the high pedestrian volume, estimated time of completion is 10:30pm

 

Bus Stops

9:35am – Bus stop salting, estimated time of completion is 10:30pm

 

Manual Locations

6:30am – Manual locations are being cleared/salted, estimated time of completion is 2:30pm